THE EVOLUTION OF SHANGHAI GRAND THEATRE’S PUBLIC SPACES

As a profound regeneration of public space within the context of urban renewal, the revitalization of the Shanghai Grand Theatre was executed under the management’s strict mandate of “zero interruption to performances.” Between 2018 and 2025, Supercloud Studio adopted a phased, scenario-specific, and parallel-growth strategy to complete a systematic upgrade of over 10,000 square meters. This comprehensive renewal encompassed the underground transit hub, ticket center, small theatre, and backstage areas. This six-year organic evolution not only reshaped the holistic spatial experience but also forged a dual dimension bridging “professional performing arts” and “daily civic life.” While safeguarding the seamless operation of world-class artistic production, the design precisely answers the public’s profound desire for openness, social interaction, and lingering.

Project Information

建成
6.6 years
上海

Consultant firms

法国夏邦杰事务所与华东建筑设计研究院(ECADI)联合设计
/
蘑菇云设计工作室
蘑菇云设计工作室
麓米照明
SURE Design
条件反射
璟筑装饰工程(上海)有限公司

Design

徐迅君
室内设计团队(蘑菇云设计工作室): 徐迅君、徐聪、邵俐、申云、张智斌、崔强松、季杰、张旭东、薛萌 、杨育青、文悦、杨泽民 照明设计团队(麓米照明):庞磊 郑嘉豪 袁喆 标识设计团队: SURE Design(B2F地下车库及B1F化妆层,5F小剧场,6F办公区 ) 条件反射(1F沿街导视系统及票务中心,水房改造部分) 中剧场新媒体视觉:上海贝希摩斯文化传媒有限公司